Site Specific (Bespoke) Risk Assessment and Method Statement Templates | Safety Services Direct

Site Specific Risk Assessment and Method Statement

p
Product Code: CON12
Site Specific Method Statement and Risk Assessments - £150.00 Site Specific method statement and Risk Assessments written for your specific project. Call us today to discuss your specific Risk Assessment and Method Statement requirements.



£150.00

Course Information

Site Specific Method Statement & Risk Assessments

Site Specific Method Statements and Risk Assessments written specifically for you and provided in PDF format for ease of printing and issue to your clients.

Call us on 01237 477931 for more information about our Site Specific Method Statement and Risk Assessment Writing Service.

Please note that this is for a site specific Method Statement and the corresponding Risk Assessments which will be prepared and written specifically for your organisation, so a short delay will occur before despatch whilst your documents are prepared. 
WRITING SERVICE, ONLINE, HEALTH, SAFETY, CONSULTANCY, PROFESSIONAL,    CONSULTANCY, ONLINE, PACKAGE, SERVICE, Builders, Contractors, Electricians, Plumbers, Plasterers, Brickwork contractors  Civil Engineering companies  Groundworks companies  Plant hire campanies, Roofing, contractors, Drainage, Landscape,  gardeners


If you have any queries about our Method Statement and Risk Assessment writing service, call us today, our phone lines are manned throughout the working day, whilst out of hours calls can also be arranged where necessary to discuss your method statement and risk assessment requirements. 

SITE, SPECIFIC, SITE SPECIFIC, METHOD, STATEMENT, RISK, ASSESSMENT, SERVICE, WRITING, ONLINE, PROFESSIONAL

All companies who employ 5 or more people must have a written Method Statements (Safe Systems of Work) and Risk Assessments specific to their activities.  Our Health and Safety Method Statement and Risk Assessment Writing Service has been prepared this to address your method statements and risk assessment requirements, by enabling you to have professionally prepared risk assessment and method statement documents without having to spend hours writing risk assessments and method statements yourself!!

RISK ASSESSMENT, RISK, ASSESSMENT, METHOD, STATEMENT, METHOD STATEMENT, ONLINE

Please state in the box above, the individual task for which the site specific Method Statement and risk assessments are needed, ie: Bathroom Replacement; Window Cleaning; Roofing; Painting; Refurbishment; Demolition; Construction of Foundations; Installation of Partitions; installation of new sub-mains; air conditioning maintenance etc.  Please note that Risk Assessments and Method Statements for more hazardous tasks such as complex demolition or asbestos removal works may be subject to an additional fee.

Once your method statement and risk assessment order has been recieved, we will contact you for the additional information which we will need to be able to complete your site specific Method Statement and Risk Assessments.

If you need multiple site specific method statements & risk assessments, please add the approriate number of method statements/risk assessments to the Shopping Cart, remembering to specifiy what tasks you need the site specific method statements and risk assessments to be prepared for.

SITE SPECIFIC METHOD STATEMENT AND RISK ASSESSMENTS
 

The type of Method Statements that we typically prepare include, but are not limited to the following Method Statements:

  • Bathroom fitting and bathroom replacement method statements
  • Electrical installation and electrical rewiring method statements
  • Demolition method statements
  • Soft strip method statements
  • Refurbishment method statements
  • Demountable partition method statements
  • Installation of suspended ceiling method statements
  • Installation of MF Ceiling method statements
  • Shop fitting and refurbishment method statements
  • Fire alarm and detection systems method statements
  • Roofing method statements
  • Carpentry, joinery and general woodwork method statements
  • Flooring (engineered wood, laminate, vinyl, safety vinyl, carpet, tiles etc) method statements
  • Kitchen fitting and kitchen replacement method statements
  • Excavation and site clearance method statements
  • Groundworks and earth works method statements
  • Drainage installation method statements
  • Drain cleaning and surveying method statements
  • Brick, block and general masonry work method statements
  • Stonework method statements
  • Fencing (Timber, welded mesh, palisade, concrete etc) method statements
  • Landscaping and grounds maintenance method statements
  • Tree Surgery Method statements
  • Ceramic tiling method statements
  • Underpinning method statements
  • House building method statements
  • Painting and decorating method statements
  • General plumbing and central heating method statements
  • Plastering and dry lining method statements
  • Construction of stud partition method statements
  • CCTV and security installation method statements
  • Construction of internal partitions method statements
  • General construction method statements
  • Commercial cleaning method statements
  • Window and door installation method statements
  • General maintenance method statements
  • Plus many many more................

As Chartered Construction and Chartered Safety Professionals we understand the construction industry as well as health and safety and provide professional advice and assistance that is right for you!  Just give us a call to discuss your specific method statement and risk assessment needs. 

Call us on 01237 477931 to discuss your method statement requirements.

Related Products

  • Our comprehensive Safety Advisory Service (SAS) provides you with access to your own Competent Health and Safety Advisor/Consultant for less than £1.00 a day. Enabling you to effectively have your own named Health and Safety Consultant/Advisor. Our Safety Advisory Service is also ideal for those looking to gain CHAS, SafeContractor, EXOR, SMAS or other SSIP/Contractor Accreditations.
    £295.00
  • Health and Safety Policy and Procedures Manual for Builders, Contractors and other Construction based organisations. This Health and Safety Policy is for all organisations working in the construction industry who need a professional health and safety policy. Unlike others, this health and safety policy is a specific health and safety policy for builders and contractors. The ultimate Health and Safety Policy for builders and contractors and fully updated for CDM 2015; Control of Asbestos Regulation 2012 and RIDDOR 2013
    £149.00
  • Principal Contractor, Construction Phase Plan (CPP) for Non-Notifiable, Low Risk, Short Duration, Minor Works Project. We prepare your Construction Phase Plan (CPP) or Construction Phase Health and Safety Plan on your behalf! Construction (Design and Management) Regulations 2015 or CDM2015.
    £175.00
  • Construction Phase Plan (CPP) for CDM 2015 Notifiable Projects. We prepare your Construction Phase Plan (CPP) or Construction Phase Health and Safety Plan for you, on your behalf! Construction (Design and Management) Regulations 2015
    £250.00
  • Specific COSHH Assessments prepared for the products that you use, based on the content of the Material Safety Data Sheets (MSDS).
    £35.00